Ask any moulding supervisor in Mumbai what July does to the reject bin and you'll get a long answer. Silver streaks on a polycarbonate cover. Bubbles inside a nylon gear. A PET preform that looks fine and then splits in the blowing machine. Water marks on a glossy ABS part, straight off a mould that was sweating all shift.

Most of it comes back to one thing. Water in the air, getting into the resin, onto the mould, or both.

As an industrial dehumidifier supplier working with factories across India, we hear the same story every monsoon. The dryer's running. The chiller's running. The process sheet hasn't changed. And quality still drops off a cliff. So let's look at why that happens, and what you can actually do about it at the room level.


Some plastics drink water. Others just sit in it.

Polymers fall into two camps. Hygroscopic resins pull moisture from the air right into the pellet: nylon (PA6 and PA66), PET, polycarbonate, PBT, ABS, PMMA, TPU and PLA all behave this way. Non-hygroscopic resins like polypropylene and polyethylene only collect moisture on the surface.

That difference matters because absorbed water doesn't wipe off. When a wet PET or PC pellet reaches melt temperature, the water attacks the polymer chain and breaks it. That's hydrolysis. Molecular weight drops, the melt turns runny, and the finished part comes out brittle. PET loses intrinsic viscosity. Nylon loses impact strength. Polycarbonate goes hazy and splays.

The limits are tight. PET usually needs to be below 0.005% moisture (that's 50 ppm) before processing. Polycarbonate sits around 0.02%, ABS around 0.1%, and nylon roughly 0.1 to 0.2%. Grades vary, so always check your resin datasheet. But you get the idea. These are tiny numbers, and humid Indian air is very good at undoing them.

PP and PE aren't completely off the hook either. Filled grades carry talc or calcium carbonate, and those fillers absorb water. So does a lot of masterbatch carrier. That's where the voids and splay on "non-hygroscopic" jobs come from.

Your resin dryer is doing its job. The air around it isn't helping.

Every serious moulder runs a desiccant dryer at the hopper. Fair enough. So why should the room matter?

Start with the incoming material. Dryers are sized for a certain starting moisture. Resin that's been sitting in an open gaylord or a slit bag in a damp godown arrives wetter than that, which means it needs longer residence time. And when production's running behind, guess what gets shortened first.

Then there's re-absorption. Dried pellets waiting in an open hopper, a loader line or a crate on the floor start picking up water within minutes in humid air. Nylon and PET are the worst offenders.

Regrind is the quiet one. Sprue and runner regrind usually sits around longer than virgin material, often uncovered, and goes back into the hopper carrying whatever the room gave it.

A dehumidified resin store and conveying area doesn't replace your dryer. It just means the dryer starts from a better place, and the pellet stays dry on its way to the screw.

Sweating moulds are a cycle-time tax nobody budgets for.

This is the one most plants underestimate. Chilled moulds run cold, with water at 10 to 15 °C through the tool being normal for fast cycles on caps, closures, thin-wall packaging and preforms. The moment that mould surface is colder than the dew point of the surrounding air, water condenses straight onto the steel.

Here's what that looks like with real numbers. A shop floor at 30 °C and 70% RH (a fairly mild monsoon day in Mumbai or Chennai) has a dew point of about 23.9 °C. A mould at 15 °C is nearly nine degrees below that. It'll be dripping. Even an air-conditioned moulding room at 25 °C and 60% RH sits at a dew point of 16.7 °C, so that same mould still sweats. Bring the room down to 25 °C and 50% RH, though, and the dew point falls to 13.9 °C. Now the mould is above it and stays dry.

Sweating costs you water marks and streaks on glossy parts, defects along the parting line, and rust pitting on cavity steel that's expensive to polish out. But the biggest cost hides in the cycle time. Because the usual fix is to raise the chiller temperature until the dripping stops. Every degree you add to the mould adds cooling time. On a 16-cavity cap mould running round the clock, two extra seconds a cycle adds up to thousands of lost parts a day.

Control the humidity around the machine and you can run the mould as cold as the process wants. One honest caveat: if you're running moulds below about 10 °C, the dew point you need gets low enough that the mould area should be enclosed, and it's worth a site visit before you buy anything.

Fighting mould sweating this season? Our team will check your room conditions and chiller settings and suggest the right setup. Book a free consultation or call 022 4343 2323.


Extrusion, film and compounding have their own moisture headaches.

Blown film lines running filled masterbatch see lacing and holes when the filler's picked up water. PET sheet and strapping lines lose intrinsic viscosity and the product turns brittle. Pipe and profile extrusion shows voids in the wall. PVC itself isn't very hygroscopic, but the fillers, stabilisers and other powder additives that go into a compound are. They cake in the bags, bridge in the feeders and throw your dosing off. Powder handling areas behave best at around 40 to 45% RH.

Stored moulds and finished goods need dry air too.

A mould is often the most expensive thing on the shop floor. Leave one idle through the monsoon in a humid tool room and it comes back with rust bloom on the cavity. Steel corrosion speeds up once surface humidity passes about 60%, so keep mould storage and machined parts staging below 55% RH.

Finished goods matter as well. Nylon parts take on moisture after moulding and can grow slightly, which throws off fit on tight-tolerance assemblies. Corrugated cartons soften and stacks lean or collapse. Labels lift. And cartons sitting in a damp warehouse for a few weeks can grow mould, which is not what a customer wants to unpack.

So what humidity should a plastics plant aim for?

For resin stores, dryer and loader areas, 40 to 50% RH works well. Around chilled moulds, think in dew point rather than RH: keep the room dew point a few degrees below the mould surface temperature. In practice, many plants land at 45 to 50% RH at 24 to 26 °C, which gives a dew point of roughly 13 to 15 °C. Tool rooms and mould storage should stay below 55%, and finished goods warehouses do fine at 45 to 55%.

That's why dew point monitoring beats a cheap RH meter on a pillar. RH changes every time the temperature moves, so the same air can read 60% in the morning and 45% at 3 pm without a gram of water changing. Dew point doesn't play that trick. Log it near the machines at the start of each shift and again mid-afternoon, and you'll see your sweating risk before the first wet part does.

Choosing the right industrial dehumidifier for your plant

The right industrial dehumidifier depends on room volume, how many doors open and how often, ventilation, and how bad the monsoon gets where you are. Here's how our White Westinghouse range maps to a typical plastics plant.

Small rooms (QC labs, resin sample rooms, small tool cribs): the AWHD-12L (12 litres/day) and AWHD-20L (20 litres/day) handle these easily and keep testing conditions steady.

Mid-size spaces (resin stores, masterbatch rooms, packing areas, mould storage): look at the AWHD-306L (30 litres/day), AWHD-307L (30 litres/day) or AWHD-40L (40 litres/day).

Production areas (a bank of moulding machines, extrusion lines, dryer and regrind zones): this is where the WDE series earns its keep. The WDE-603T (60 litres/day) and WDE 606 (60 litres/day) suit moderate halls, while the WDE 702 (70 litres/day) and WDE 100 (100 litres/day) take on bigger or busier floors.

Large halls and warehouses (big moulding shops, raw material godowns, finished goods stores with constant door traffic): go for the WDE 110S (110 litres/day), WDE150S (150 litres/day) or the WDE-190S (190 litres/day).

Not sure which dehumidifier for your industrial application fits? Browse the full industrial dehumidifier range, or just send us your room size and machine count. We'll do the sizing for you.

Talk to Our Team

JET INDIA is an authorised White Westinghouse USA distributor and your industrial dehumidifier supplier with pan-India delivery. Get a free consultation for your plant.

Call us: 022 4343 2323

Free Consultation Contact Us Call for Inquiry Free Demo in Mumbai Call Us Email Us

Contact Us / Visit Our Office  |  Explore Our Commercial Dehumidifiers

Dry air is cheaper than rejects.

 2026-11-13T09:10:45

Other Pages

View all pages